top of page

Photo Credit: Ashley Porton

Before Project

Flood

This project was a reconfiguration of the master bedroom, closet and the hall bathroom. The client needed easier access to the bathroom, so we made the bathroom larger with a doorway into the bedroom.  A local craftsman installed the new front door and we added the threshold ramp.

 

We were able to preserve the original charm and character of this home while accommodating the changes needed. We also made several recommendations regarding adaptive equipment, which made daily tasks easier and safer. 

WHAT

Master Suite

WHERE

Norman, OK

WHEN

Oct 2021

bottom of page